Parking comes before the charger model
Confirm a suitable private parking position and cable route. Shared bays, leased parking and on-street arrangements need their own permissions. A standard driveway quotation should not assume the right to trail a cable over a public pavement.
Tell the installer where the electricity supply is and whether solar or a battery is already fitted. They should assess electrical capacity and the required protection, rather than treating the charger as a stand-alone appliance.
Ask when the car will be connected
Solar-aware charging can use available surplus when the vehicle is at home and connected. If the car is away through most daylight hours, the benefit differs from that of a home-based worker with a car on the drive.
Compare realistic mileage and charging times with the PV forecast. Overnight grid charging may be another option, but any savings depend on tariff terms and the vehicle’s requirements. Keep these scenarios separate.
Explain the control priorities
Ask how the charger interacts with the solar inverter and battery. The system needs a sensible priority when household appliances, storage and the vehicle want electricity at the same time. Confirm compatibility and minimum solar-surplus charging requirements.
A home battery should not be sold on the assumption that it will always fully charge an EV. Compare its usable energy with the vehicle’s needs and household demand, including losses.
Request a demonstration at handover
Ask the installer to show scheduling, load management and solar modes, and to explain what happens if the internet connection fails. Keep the support contact and account-transfer instructions with the installation documents.
For a Bullsmoor or Freezywater enquiry, provide the full address so the correct council and parking arrangements can be checked. The installer sets the equipment specification and price after assessment.
Sources and further guidance
- Energy Saving Trust: charging electric vehicles
- UK Power Networks: solar, storage and EV connections
- Energy Saving Trust: solar panels
Checked 8 September 2026. Confirm current requirements with the relevant provider or authority.
Explore the related service and installer questions
Want a number for your roof?
A partner installer can get your next appointment booked within 24 hours of receiving your enquiry. Survey and installation dates are agreed separately.
Start an installer enquiry